Lake Vesuvius is located just off State Route 93, 6.5 miles north of Ironton, Ohio.

 

Brief History of the Area, the Furnace, and Lake Vesuvius

The Storms Creek valley was once a narrow valley of farmland flanked by steep cliffs and hills. As iron production began in the Hanging Rock Iron Region the Vesuvius Iron Furnace along Storms Creek was one of 69 iron furnaces in the area. Built in 1833 it produced pig iron using the cold blast method until 1863, when it was the first to experiment and adopt the revolutionary hot blast method. Vesuvius Furnace produced 10 tons of iron each day until its final blast in 1906.

Today only this stack remains, but in its prime Vesuvius Furnace supported hundreds of workers and their families and played a key role in the early iron industry. The men who owned the furnaces were called ironmasters, and many played another significant role in history. Many of them were strong abolitionists and supported the Underground Railroad. The furnace complexes provided safe houses and money for the movement of slaves seeking freedom. The secret routes that the runaway slaves followed lie along the same roads as southern Ohio’s iron furnaces. With the help of the ironmasters, other families and supporters of the Underground Railroad, hundreds of escaped slaves reached freedom.

After the depression in the 1930’s, the U.S. Forest Service began buying land, planting trees, and building recreational facilities. The most ambitious of these was the construction of a dam near the ruins of the Vesuvius Furnace. In 1937 construction got underway.

The lake’s construction was done by the Civilian Conservation Corps (CCC). CCC Company 0526-C was stationed in nearby Pedro, Ohio, and known at various times as Camp Dean, Camp Lawrence, and Camp Vesuvius. The company had about 200 enrollees and 12 supervisors. They completed work on the dam, campgrounds, bathhouse and beach, warehouse, recreational office and garage, and museum and classroom in 1941 but worked in the area until 1942 when the CCC was phased out as the country entered World War II. A CCC newsletter reports the cost of construction of the dam was approximately $100,000.

The dam itself and 7 of the buildings at the Lake Vesuvius site are historically significant and were determined eligible for listing on the National Register of Historic Places in 1999. To preserve the historic significance of the dam, the cut face rocks were carefully numbered and removed, then later replaced.

The area changed very little in the 60 years between 1941 and 2001. But when National Dam Safety Standards and Regulations were tightened after several spectacular dam failures in the west, the Wayne NF was notified that the Lake Vesuvius dam no longer was in compliance. Though in no danger of failing, the lake needed a different type of dam if it were to meet the probable maximum flood requirements assigned for the area.

Timeline for Progress Lake Vesuvius Rehabilitation Project

2001 --  The lake is drained and reconstruction begins 

bullet Valve was opened January 22, 2001 and by mid-February the lake was drained 
bullet The Forest Service stabilizes the lake bed by seeding it with perennial rye grass 
bullet Scoping letter was sent out to the public on February 23rd and work begins on the environmental analysis 
bullet A planning charette was held for the public to provide ideas 
bullet Wayne NF and OUSC Nature Center sponsor Lake Vesuvius Earth Day Clean-up 
bullet Vesuvius Overlook was constructed and opened to the public 
bullet Dam Reconstruction contract awarded and work began 
bullet Excavation of dam and spillway area - scalping 4-6 feet of dirt and stockpiling it

2002 – Analysis completed and improvements underway 

bullet Environmental Analysis completed and work begins on fisheries and recreation projects 
bullet A roller compacted concrete technique (RCC) used to reconstruct the dam and spillway 
bullet Fisheries and Recreation Improvements in Lake Bed completed 
bullet Replace two new foot bridges along Vesuvius Trail and at the base of the dam 
bullet Core drilling and surveys completed for the construction of a new boardwalk
bullet Improvements at the boat dock begin (enlarged parking lot and new boat ramp) 
bullet Spillway work completed

2003 – Construction completed 

bullet Lakebed is mapped in order to produce an angler map 
bullet Surveys completed for beach house sewage system, barrier-free piers and boat-in campsites and beach area boat dock 
bullet Final touches put on the spillway and dam 
bullet Fish habitat structures placed in the lakebed 
bullet Boardwalk contract awarded and work completed 
bullet Valve was closed December 15, 2003 and the lake quickly refilled

2004 – Recreation Site Reopens! 

bullet Ohio Department of Natural Resources stocked 14,000 large mouth bass and 43,000 bluegill on March 31 
bullet 1,000 Rainbow trout were stocked in support of the Wheelin Sportsman Event held on April 9 
bullet Grand re-opening held on May 24, 2004

For more information call 740-534-6500

Note: All information on this page courtesy of the Wayne National Forest.

 

SM = Service Mark of the Friends of Freedom Society, Inc.
Copyright © 2007 Friends of Freedom Society, Inc.  All Rights Reserved.